Ask

Prebuilt is only $110 more than my parts list, is building it myself still worth it at that gap?

Go down the prebuilt listing and write in the actual model number for: power supply, motherboard, RAM kit and speed, SSD, CPU cooler, and how many case fans. If the listing won't tell you, that is the answer. Every time I have done this exercise the small gap turned into two hundred and something once I matched the parts honestly, which is roughly the point where building starts to make sense to me. Under about $150 of difference I stop arguing with people who want the warranty.

141 · in/pc-builds ·

How long before homemade soap stops being harsh on my hands

It genuinely changes, and ten days is far too early to judge. A bar at ten days still has significant water in it and the crystalline structure is still organising - early bars feel harsher, dissolve faster and lather less than the same bar at eight weeks. Try the same sliver at week six and it'll be a different product.

That said, 30% coconut is at the upper end for a hand bar. Coconut is where the big bubbly lather comes from and also where the stripping feeling comes from. Most people settle somewhere around 20-25% for a bar that still lathers well without the squeak. If your finished bar is still drying at eight weeks, that's the number to change, plus maybe going from 5% to 6-7% superfat.

So: wait it out, and if it's still harsh in six weeks, adjust the recipe rather than concluding soap making isn't for you.

812 · in/cold-process ·

Took the side seams in 2cm too far and already trimmed the seam allowance

Practical numbers before you commit: you need about 1.5cm allowance on each edge to insert a panel cleanly, so if you have 6mm left you will be trimming back and losing a little more width before you gain any. Work out the finished width you need first, then add three centimetres for seams, then see whether your leftover fabric covers two strips of that.

44 · in/sewing-fit ·