Ask

three retainer clients, three forks of the same repo - how do i merge them without breaking anyone

Did a smaller version of this and the thing I would tell past me is that the first cutover is the scary one and it is over in an hour. I spent two weeks writing a settings file per client, tested it against a copy of their database, then swapped one client over on a Friday morning specifically so I would have the day to fix things. It took forty minutes, one thing broke (a report header still said the old company name), and the client never noticed.

22 · in/service-to-saas ·

Renovation shows make a full sash and plaster job look like two episodes, what did yours actually take

What television removes is everything that is not filmable. Waiting three weeks for a joiner who is finishing another job, waiting for plaster to dry properly before decorating, the day spent moving furniture and masking, the second visit because a sash cord snapped on a window they had already done. It also removes the fact that many of those programmes have materials or labour supplied on favourable terms in exchange for being on screen, which is not a scandal but it does mean the numbers on the screen are not numbers you can plan with. The work itself is genuinely not that dramatic, the calendar around it is where the time goes.

97 · in/old-house-repair ·

Keep the original hem or cut and topstitch when shortening jeans four inches

There is a middle option people forget: cut off four inches from the top of the hem allowance, then reattach the original hem to the shortened leg. You're taking the length out of the leg rather than folding it, so there's no bulk and only a small taper mismatch, which you can ease over a couple of inches. It's more work and there's a visible seam an inch above the hem, which some people like and some hate.

104 · in/mending ·